Guangdong Construction Engineering: Guangdong Shuidian's 90MW integrated solar and energy storage project in Bairro, Tibet is connected to the grid for power generation.

date
04/09/2025
Guangdong Construction Engineering announced in the evening of September 1st that recently, the full-scale subsidiary of Guangdong Yue Waterpower Energy Investment Group Co., Ltd., Bai Lang County Yue Waterpower New Energy Co., Ltd., which is a wholly-owned subsidiary of the company, has successfully connected to the grid for power generation in the 90MW photovoltaic and energy storage integration project in Bai Lang County, Tibet. The photovoltaic power generation installed capacity is 90MW, and the supporting energy storage scale is 18MW/72MWh. The grid-connected power generation of this project will have a certain positive impact on the company's future operating performance. As of now, the company has accumulated a total installed capacity of clean energy projects that have been put into operation and generated electricity of 4662.89MW, including 380.50MW of hydroelectric power generation, 800.36MW of wind power generation, 3382.03MW of photovoltaic power generation, and 100MW of independent energy storage.