The 17,000 square meters of photovoltaic panel arrays at the Babu Oilfield No. 2 camp constructed by the construction company under CNPC Engineering are officially connected to power.

date
18/08/2025
China National Petroleum Corporation's engineering construction company in the Gulf region fully utilizes natural conditions and gradually replaces high-priced diesel consumption through the "photovoltaic + diesel power generation" dual system mode, effectively reducing greenhouse gas and pollutant emissions while reducing costs and increasing efficiency. Recently, the company's Gulf Region company constructed the addition of a 1.7 million square meter photovoltaic array at the Bab Oilfield No. 2 camp, bringing clean energy to this sandy area once again.