Starry Sky Aerospace has completed multiple critical ground tests for the Ceres II carrier rocket.

date
12/08/2025
Starry Sky Aerospace announced today that it has recently completed several key ground tests for the Ceres-2 carrier rocket, including electrical system comprehensive matching test, control system semi-physical simulation test, orbit attitude control power system full system hot test, first-stage engine joint test, second-stage engine joint test, fairing static load test, fairing separation test, and launch vehicle and rocket integrated rehearsal test, etc. The first flight of the Ceres-2 carrier rocket is counting down, and it will carry 6 commercial satellites and 2 non-separable payloads, with a total payload exceeding 1 ton.