Starry Sky Aerospace has completed multiple critical ground tests for the Ceres II carrier rocket.
Starry Sky Aerospace announced today that it has recently completed several key ground tests for the Ceres-2 carrier rocket, including electrical system comprehensive matching test, control system semi-physical simulation test, orbit attitude control power system full system hot test, first-stage engine joint test, second-stage engine joint test, fairing static load test, fairing separation test, and launch vehicle and rocket integrated rehearsal test, etc. The first flight of the Ceres-2 carrier rocket is counting down, and it will carry 6 commercial satellites and 2 non-separable payloads, with a total payload exceeding 1 ton.
Latest