The country's largest "linear Fresnel" solar-thermal integrated energy demonstration project has shifted to commercial trial operation.

date
09/07/2026
According to China Three Gorges Energy, on July 7, the country's largest "linear Fresnel" concentrated solar thermal energy demonstration project - the Three Gorges Group's 1 million kilowatt "solar thermal + photovoltaic" project in Hami successfully entered the commercial trial operation stage. The project is located in the Gobi Desert area of Hami, Xinjiang, consisting of a 100,000 kilowatt molten salt solar thermal energy storage power station and a 900,000 kilowatt photovoltaic power station. The solar thermal project is equipped with 260,000 high-precision tracking mirrors, with a total collection area of 800,000 square meters, and a matching 8-hour high-temperature molten salt storage system, providing stable storage and power generation capabilities.