Since May 23, a total of 129 coal mines in Shanxi have been shut down, with 16 of them already resuming production.
According to the latest research results from Mysteel on May 27th, since May 23rd, a total of 129 coal mines in Shanxi have been shut down, with 16 of them already resumed production, totaling a capacity of 20.7 million tons. There are still 113 coal mines in a state of shutdown, with a total capacity of 125 million tons, affecting a daily production of 328,400 tons of raw coal. The progress of coal mine resumption in Lvliang is relatively positive, with a total of 19 new shutdown coal mines in Lvliang since the 23rd, of which 12 have already resumed production, with a capacity of 14.1 million tons, leaving only 7 coal mines still in a state of shutdown with a total capacity of 9.9 million tons. Taiyuan has added 8 new shutdown coal mines with a total capacity of 6.6 million tons.
Latest

