The construction of the Fuchimen comprehensive bridge on the Ningbo-Zhoushan Railway has made new progress.
On May 17, the crossbeam on the west main tower of the Fuchi Gate public and railway dual-use bridge of the Ningbo-Zhoushan Railway, which was constructed by China Railway Construction Bridge Bureau, was successfully poured. The Fuchi Gate public and railway dual-use bridge connects Zhoushan Island with Fuchi Island and is one of the key projects of the Ningbo-Zhoushan Railway. The total length of the bridge is approximately 1726 meters, with a main span of 388 meters, and it is arranged in a form of double-track railway and 6-lane highway on the same level.
Latest

