Today, the Jinchuan Hydropower Station in the Dadu River Basin was officially connected to the grid for power generation.

date
12/05/2026
Today, the Jinchuan Hydropower Station located in the Dadu River basin has officially begun its grid-connected power generation. The total installed capacity of the Jinchuan Hydropower Station is 860,000 kilowatts, with 4 units of 215,000 kilowatt mixed-flow turbine generator sets. The annual power generation is approximately 3.5 billion kilowatt-hours.