The main bridge of the Guanzhong River on the Shenjiang Railway has successfully completed its closure along the Jiyasha Waterway.

date
10/02/2026
On February 10th, the main bridge of the Guangzhou Construction Group of China Railway Engineering Bureau on the Guangdong-Zhejiang Railway, the Guangdong-Zhongjiang Bridge, successfully completed the closure over the Jiyasha Waterway, becoming the first main bridge of the entire Guangdong-Zhejiang Railway to achieve closure. The main bridge over the Jiyasha Waterway is approximately 789 meters long and is a key and control project of the entire Guangdong-Zhejiang Railway. The Guangdong-Zhejiang Railway is an important part of China's "Eight Vertical and Eight Horizontal" high-speed railway network along the coastal corridor. The line starts from Shenzhen Xili Station, with a total length of approximately 116 kilometers, crossing the Pearl River Estuary, connecting the cities of Shenzhen, Dongguan, Guangzhou, Zhongshan, and Jiangmen in the Guangdong-Hong Kong-Macau Greater Bay Area. After the completion of the Guangdong-Zhejiang Railway, it will be possible to reach Shenzhen and Jiangmen within 1 hour.