Subsidiary of Jiangsu Guoxin Corp., Ltd. (002608.SZ) - Guoxin Shazhou has put a 1 million kilowatt unit into operation

date
08/07/2025
avatar
GMT Eight
Jiangsu Guoxin (002608.SZ) announced that its holding subsidiary Jiangsu Guoxin Shazhou Power Generation Co., Ltd. (referred to as "...
Jiangsu Guoxin Corp., Ltd. (002608.SZ) announced that the first unit of the two 1 million kilowatt secondary reheating ultra-supercritical coal-fired generating units newly built by its subsidiary Jiangsu Guoxin Corp., Ltd. Shazhou Power Co., Ltd. (referred to as "Guoxin Shazhou") has completed a 168-hour full load trial operation and officially started production operation on July 8, 2025.