15.16 - China Railway (00390) won the bid for the 15.16 billion yuan China-Kyrgyzstan-Uzbekistan railway project, helping with the construction of the "Belt and Road" initiative.

date
30/04/2025
avatar
GMT Eight
China Railway Group Limited (00390) announced that recently, its subsidiary, China Railway Fifth Group Co., Ltd., has won the bid for the Zhongji Wuti Railway (...).
China Railway (00390) announced that its subsidiary, China Railway Fifth Bureau Group Co., Ltd., has won the bid for the ZJWZQ-1 tunnel project in the initial construction phase of the China-Kyrgyzstan-Uzbekistan Railway (within the territory of the Kyrgyz Republic, hereinafter referred to as the Kyrgyz section). The bid price is approximately RMB 1.516 billion, with a construction period of 2191 calendar days. The ZJWZQ-1 project section has a total length of 12.464km, with tunnels accounting for 99.99% of the length at 12.454km. The Jalarabat end bridge platform of Alpa 3 Bridge is 5.7m long, with station roadbed and roadbed accessories measuring 10m. The main works include the Jalarabat end bridge platform of Alpa 3 Bridge, Nalun 1 Tunnel, and Jamandawan Station roadbed. The China-Kyrgyzstan-Uzbekistan Railway is a landmark project for the cooperation under the "Belt and Road" initiative promoted by the leaders of the three countries. Winning the bid for the initial construction phase project in the Kyrgyz section is another important achievement for China Railway in actively implementing the "Belt and Road" initiative and promoting high-quality operation overseas.